{"id":3463,"date":"2026-08-03T15:30:42","date_gmt":"2026-08-03T07:30:42","guid":{"rendered":"https:\/\/www.farm-master.com\/?p=3463"},"modified":"2026-08-28T16:05:16","modified_gmt":"2026-08-28T08:05:16","slug":"overseas-manure-fermentation-tank-project-guide","status":"publish","type":"post","link":"https:\/\/www.farm-master.com\/en\/news\/overseas-manure-fermentation-tank-project-guide\/","title":{"rendered":"From factories in China to farms overseas: how to ensure the smooth commissioning of organic fertilizer fermentation tank projects"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1310.4px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p class=\"code-line\" dir=\"auto\" data-line=\"15\">The most underestimated aspect of overseas equipment projects is not equipment manufacturing itself, but the coordination required after manufacturing is completed.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"17\">A fermentation tank may be shipped on schedule, but if the on-site foundation dimensions do not match, power supply conditions have not been confirmed, lifting equipment is insufficient, or operators still cannot assess raw material moisture after commissioning, the project will still fail to achieve stable production.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"19\">Therefore, the export of organic fertilizer fermentation tanks should not be treated as a standalone equipment purchase, but rather managed as a cross-border engineering project.<\/p>\n<h2 id=\"\u7b2c\u4e00\u9636\u6bb5\u5148\u5b8c\u6210\u9879\u76ee\u6761\u4ef6\u786e\u8ba4\" class=\"code-line\" dir=\"auto\" data-line=\"21\">Phase One: Complete Project Condition Confirmation First<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"23\">Before finalizing the model, the supplier and the client should jointly confirm raw materials, site conditions, and operational objectives.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"25\">Regarding raw materials, it is necessary to understand livestock species, daily output, moisture content, manure collection methods, and sources of bulking agents. Regarding the site, general layout plans, equipment foundation locations, roads, drainage, power supply, and local climate data are required. Operational objectives include daily processing capacity, end-product\u7528\u9014, work shifts, and future expansion plans.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"27\">If key data remain estimates, a conceptual design may be developed, but the project should not proceed directly to final manufacturing. The cost of modifications for cross-border projects is significantly higher than for domestic ones; one additional confirmation early on can often prevent large-scale rework at the destination site.<\/p>\n<h2 id=\"\u7b2c\u4e8c\u9636\u6bb5\u628a\u5f53\u5730\u8981\u6c42\u5199\u8fdb\u6280\u672f\u6587\u4ef6\" class=\"code-line\" dir=\"auto\" data-line=\"29\">Phase Two: Incorporate Local Requirements into Technical Documentation<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"31\">Different countries have different electrical, safety, environmental, and product certification requirements. The project contract should clearly specify applicable voltage, frequency, control language, standards for major components, ingress protection ratings, and documentation language.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"33\">For import certifications, installation permits, or environmental permits that must be obtained locally, clients are typically more familiar with their own national procedures; the equipment supplier should provide equipment drawings, parameters, material descriptions, and operational documentation. Both parties need to list the documentation deliverables and define responsibility boundaries before manufacturing begins.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"35\">If the final fermented material is planned to be sold as fertilizer, local fertilizer registration and testing regulations must be reviewed separately. Equipment can provide fermentation conditions, but it cannot replace the local regulatory authority's determination regarding the product.<\/p>\n<h2 id=\"\u7b2c\u4e09\u9636\u6bb5\u8ba9\u73b0\u573a\u57fa\u7840\u4e0e\u8bbe\u5907\u5236\u9020\u540c\u6b65\" class=\"code-line\" dir=\"auto\" data-line=\"37\">Phase Three: Synchronize Site Foundation Work with Equipment Manufacturing<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"39\">While the equipment is being manufactured in China, the overseas site can typically proceed concurrently with foundation, drainage, power supply, and road construction. To avoid discrepancies, the supplier should provide confirmed foundation drawings and load information, while the client should provide construction photos and measured dimensions as feedback.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"41\">It is recommended that at least one remote site inspection be completed before shipment, focusing on:<\/p>\n<ul class=\"code-line\" dir=\"auto\" data-line=\"43\">\n<li class=\"code-line\" dir=\"auto\" data-line=\"43\">Foundation position, elevation, and embedded parts;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"44\">Maintenance access space around the equipment;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"45\">Driving and turning areas for loading vehicles;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"46\">Access routes for lifting equipment;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"47\">Positions of control cabinets, blowers, and deodorization equipment;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"48\">Cable routing, water supply, drainage, and grounding;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"49\">Finished product discharge and transfer directions.<\/li>\n<\/ul>\n<p class=\"code-line\" dir=\"auto\" data-line=\"51\">If the project is located on a remote farm, it must also be confirmed whether heavy vehicles can reach the site from the port or via urban roads.<\/p>\n<h2 id=\"\u7b2c\u56db\u9636\u6bb5\u88c5\u8fd0\u65b9\u6848\u8981\u670d\u52a1\u4e8e\u73b0\u573a\u5b89\u88c5\" class=\"code-line\" dir=\"auto\" data-line=\"53\">Phase Four: Shipping Plans Must Serve On-Site Installation<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"55\">Fermentation equipment may require segmented transportation. The packaging and container loading sequence must not only protect the equipment but also consider the on-site installation sequence. If the components to be installed first are placed at the deepest part of the container, unloading and temporary storage work will increase.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"57\">Shipping documentation should include packing lists, component numbers, weights, lifting points, centers of gravity, and rain protection requirements. The client should prepare cranes of appropriate tonnage, unloading equipment, and temporary storage areas in advance.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"59\">Upon arrival, goods should be inspected immediately against the packing list, and any transportation damage should be documented. Electrical control components, sensors, and spare parts included with the shipment should be stored indoors in a dry, secure environment and should not be left outdoors with large steel structural components.<\/p>\n<h2 id=\"\u7b2c\u4e94\u9636\u6bb5\u5b89\u88c5\u68c0\u67e5\u4e0d\u80fd\u53ea\u770b\u5916\u89c2\" class=\"code-line\" dir=\"auto\" data-line=\"61\">Phase Five: Installation Inspection Must Go Beyond Visual Checks<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"63\">After mechanical installation is completed, checks are required for tank verticality, connections, agitator shafts, hydraulic systems, loading mechanisms, air ducts, deodorization systems, and safety guardrails. Before electrical commissioning, voltage, phase sequence, grounding, and motor rotation direction should also be verified.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"65\">No-load testing should verify each function individually, including loading, mixing, blower operation, discharge, spray system, and alarms. Only when each system operates independently and normally should the equipment proceed to load commissioning.<\/p>\n<h2 id=\"\u7b2c\u516d\u9636\u6bb5\u8bd5\u8fd0\u884c\u4ece\u5c11\u91cf\u7a33\u5b9a\u7684\u539f\u6599\u5f00\u59cb\" class=\"code-line\" dir=\"auto\" data-line=\"67\">Phase Six: Trial Operation Begins with Small, Stable Batches of Raw Material<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"69\">For initial startup, mixed waste with highly fluctuating moisture content is not suitable. Raw materials with stable sources that have already undergone moisture adjustment should be selected where possible, and sufficient dry bulking agents and mature recycled material should be prepared.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"71\">During the trial operation period, operators should continuously record feed volume, moisture content, temperature, airflow rate, mixing status, and discharge conditions. If temperature does not rise as expected, moisture, oxygen supply, and material structure should be checked first, rather than simply adding more inoculant or continuing to feed large volumes.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"73\">The U.S. Environmental Protection Agency has noted that composting effectiveness depends on the integrated management of oxygen, moisture, material structure, nutrient balance, and temperature. Equipment automation can improve operational consistency, but it cannot eliminate the impact of raw material variability.<\/p>\n<h2 id=\"\u7b2c\u4e03\u9636\u6bb5\u57f9\u8bad\u5fc5\u987b\u8ba9\u5f53\u5730\u4eba\u5458\u80fd\u591f\u72ec\u7acb\u5224\u65ad\" class=\"code-line\" dir=\"auto\" data-line=\"75\">Phase Seven: Training Must Enable Local Personnel to Make Independent Judgments<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"77\">Effective training should not merely teach operators which buttons to press. The local team should also know:<\/p>\n<ul class=\"code-line\" dir=\"auto\" data-line=\"79\">\n<li class=\"code-line\" dir=\"auto\" data-line=\"79\">How to quickly determine whether raw materials are too wet or too dry;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"80\">Which items to troubleshoot first when temperature is abnormal;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"81\">When to adjust airflow and mixing;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"82\">How to clean the loading and discharge systems;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"83\">Which maintenance tasks can be performed independently;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"84\">Which alarms require immediate shutdown and contact with technical support;<\/li>\n<li class=\"code-line\" dir=\"auto\" data-line=\"85\">Why entry into the tank without authorization is prohibited.<\/li>\n<\/ul>\n<p class=\"code-line\" dir=\"auto\" data-line=\"87\">Operation manuals, maintenance schedules, electrical diagrams, and spare parts lists should preferably be provided in a language version that the client can use long-term. After training, effectiveness can be verified through independent operation and fault scenario drills.<\/p>\n<h2 id=\"\u7b2c\u516b\u9636\u6bb5\u5efa\u7acb\u8de8\u5883\u552e\u540e\u673a\u5236\" class=\"code-line\" dir=\"auto\" data-line=\"89\">Phase Eight: Establish a Cross-Border After-Sales Mechanism<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"91\">Overseas after-sales service cannot rely entirely on ad-hoc business trips. Remote communication channels should be established before the project goes into production, with clear technical support time zones, response procedures, and data requirements from the client.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"93\">Clients are advised to maintain an inventory of commonly used wear parts and send operating records periodically. Distributors or large farming groups can develop local technical personnel responsible for basic inspections, lubrication, sensor replacement, and common fault diagnosis.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"95\">Equipment delivery is only the midpoint of a project. The true standard for completion is that the local team can operate the equipment safely, make correct adjustments in response to raw material and seasonal variations, and consistently produce fermented material that meets the project's intended purpose.<\/p>\n<h2 id=\"\u6d77\u5916\u9879\u76ee\u6210\u529f\u7684\u4e09\u4e2a\u5173\u952e\u8bcd\" class=\"code-line\" dir=\"auto\" data-line=\"97\">Three Key Words for Overseas Project Success<\/h2>\n<p class=\"code-line\" dir=\"auto\" data-line=\"99\">The first is<strong>Confirmation<\/strong>: Confirm raw materials, site conditions, power supply, and regulations before manufacturing.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"101\">The second is<strong>Handover<\/strong>: Ensure there are no information gaps between drawings, packing, construction, installation, and commissioning.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"103\">The third is<strong>Capability<\/strong>: Through training and after-sales support, enable the local team to operate and maintain the equipment independently.<\/p>\n<p class=\"code-line\" dir=\"auto\" data-line=\"105\">When these three elements are carefully managed, a fermentation system shipped from a factory in China can truly deliver long-term value on a farm thousands of kilometers away.<\/p>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The most easily underestimated aspect of overseas projects is the interface phase following equipment delivery; the fermenter outlet should be treated as part of cross-border engineering management, through condition confirmation, technical documentation...<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[50,52],"tags":[],"class_list":["post-3463","post","type-post","status-publish","format-standard","hentry","category-news","category-industry-insights"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7 - \u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8<\/title>\n<meta name=\"description\" content=\"Farm Master \u4e13\u6ce8\u4e8e\u755c\u79bd\u517b\u6b96\u8bbe\u5907\u4e0e\u7caa\u6c61\u8d44\u6e90\u5316\u89e3\u51b3\u65b9\u6848\uff0c\u5206\u4eab\u517b\u6b96\u73af\u4fdd\u3001\u53d1\u9175\u5904\u7406\u3001\u6709\u673a\u80a5\u751f\u4ea7\u53ca\u667a\u6167\u517b\u6b96\u76f8\u5173\u6280\u672f\u77e5\u8bc6\uff0c\u4e3a\u517b\u6b96\u4f01\u4e1a\u63d0\u4f9b\u4e13\u4e1a\u53c2\u8003\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.farm-master.com\/en\/news\/overseas-manure-fermentation-tank-project-guide\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7 - \u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8\" \/>\n<meta property=\"og:description\" content=\"Farm Master \u4e13\u6ce8\u4e8e\u755c\u79bd\u517b\u6b96\u8bbe\u5907\u4e0e\u7caa\u6c61\u8d44\u6e90\u5316\u89e3\u51b3\u65b9\u6848\uff0c\u5206\u4eab\u517b\u6b96\u73af\u4fdd\u3001\u53d1\u9175\u5904\u7406\u3001\u6709\u673a\u80a5\u751f\u4ea7\u53ca\u667a\u6167\u517b\u6b96\u76f8\u5173\u6280\u672f\u77e5\u8bc6\uff0c\u4e3a\u517b\u6b96\u4f01\u4e1a\u63d0\u4f9b\u4e13\u4e1a\u53c2\u8003\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.farm-master.com\/en\/news\/overseas-manure-fermentation-tank-project-guide\/\" \/>\n<meta property=\"og:site_name\" content=\"\u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/FarmMasterEquip\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-03T07:30:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-28T08:05:16+00:00\" \/>\n<meta name=\"author\" content=\"Farm-Master\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Farm-Master\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/\"},\"author\":{\"name\":\"Farm-Master\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#\\\/schema\\\/person\\\/ac27421b0f0b43606b9c6ce47db3add3\"},\"headline\":\"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7\",\"datePublished\":\"2026-08-03T07:30:42+00:00\",\"dateModified\":\"2026-08-28T08:05:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/\"},\"wordCount\":725,\"publisher\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#organization\"},\"articleSection\":[\"\u65b0\u95fb\u4e2d\u5fc3\",\"\u884c\u4e1a\u8d44\u8baf\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/\",\"url\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/\",\"name\":\"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7 - \u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#website\"},\"datePublished\":\"2026-08-03T07:30:42+00:00\",\"dateModified\":\"2026-08-28T08:05:16+00:00\",\"description\":\"Farm Master \u4e13\u6ce8\u4e8e\u755c\u79bd\u517b\u6b96\u8bbe\u5907\u4e0e\u7caa\u6c61\u8d44\u6e90\u5316\u89e3\u51b3\u65b9\u6848\uff0c\u5206\u4eab\u517b\u6b96\u73af\u4fdd\u3001\u53d1\u9175\u5904\u7406\u3001\u6709\u673a\u80a5\u751f\u4ea7\u53ca\u667a\u6167\u517b\u6b96\u76f8\u5173\u6280\u672f\u77e5\u8bc6\uff0c\u4e3a\u517b\u6b96\u4f01\u4e1a\u63d0\u4f9b\u4e13\u4e1a\u53c2\u8003\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/news\\\/overseas-manure-fermentation-tank-project-guide\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.farm-master.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#website\",\"url\":\"https:\\\/\\\/www.farm-master.com\\\/\",\"name\":\"\u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8\",\"description\":\"\u79d1\u6280\u8d4b\u80fd\u53d1\u9175 \u667a\u6167\u5f15\u9886\u517b\u6b96 \u7eff\u8272\u6784\u5efa\u5faa\u73af\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.farm-master.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#organization\",\"name\":\"\u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8\",\"url\":\"https:\\\/\\\/www.farm-master.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.farm-master.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/farm-master-logo.webp\",\"contentUrl\":\"https:\\\/\\\/www.farm-master.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/farm-master-logo.webp\",\"width\":716,\"height\":162,\"caption\":\"\u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8\"},\"image\":{\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/FarmMasterEquip\",\"https:\\\/\\\/wa.me\\\/8615021175063\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.farm-master.com\\\/#\\\/schema\\\/person\\\/ac27421b0f0b43606b9c6ce47db3add3\",\"name\":\"Farm-Master\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/929ee657cc35fc4cede7d7f2a0f3d1300718939f6623ddeb6f2db4a5153f9bb5?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/929ee657cc35fc4cede7d7f2a0f3d1300718939f6623ddeb6f2db4a5153f9bb5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/929ee657cc35fc4cede7d7f2a0f3d1300718939f6623ddeb6f2db4a5153f9bb5?s=96&d=mm&r=g\",\"caption\":\"Farm-Master\"},\"sameAs\":[\"https:\\\/\\\/www.farm-master.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7 - \u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8","description":"Farm Master focuses on livestock and poultry farming equipment and manure resource utilization solutions, sharing technical knowledge related to farming environmental protection, fermentation treatment, organic fertilizer production, and smart farming, providing professional references for farming enterprises.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.farm-master.com\/en\/news\/overseas-manure-fermentation-tank-project-guide\/","og_locale":"en_US","og_type":"article","og_title":"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7 - \u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8","og_description":"Farm Master \u4e13\u6ce8\u4e8e\u755c\u79bd\u517b\u6b96\u8bbe\u5907\u4e0e\u7caa\u6c61\u8d44\u6e90\u5316\u89e3\u51b3\u65b9\u6848\uff0c\u5206\u4eab\u517b\u6b96\u73af\u4fdd\u3001\u53d1\u9175\u5904\u7406\u3001\u6709\u673a\u80a5\u751f\u4ea7\u53ca\u667a\u6167\u517b\u6b96\u76f8\u5173\u6280\u672f\u77e5\u8bc6\uff0c\u4e3a\u517b\u6b96\u4f01\u4e1a\u63d0\u4f9b\u4e13\u4e1a\u53c2\u8003\u3002","og_url":"https:\/\/www.farm-master.com\/en\/news\/overseas-manure-fermentation-tank-project-guide\/","og_site_name":"\u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8","article_publisher":"https:\/\/www.facebook.com\/FarmMasterEquip","article_published_time":"2026-08-03T07:30:42+00:00","article_modified_time":"2026-08-28T08:05:16+00:00","author":"Farm-Master","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Farm-Master","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/#article","isPartOf":{"@id":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/"},"author":{"name":"Farm-Master","@id":"https:\/\/www.farm-master.com\/#\/schema\/person\/ac27421b0f0b43606b9c6ce47db3add3"},"headline":"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7","datePublished":"2026-08-03T07:30:42+00:00","dateModified":"2026-08-28T08:05:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/"},"wordCount":725,"publisher":{"@id":"https:\/\/www.farm-master.com\/#organization"},"articleSection":["\u65b0\u95fb\u4e2d\u5fc3","\u884c\u4e1a\u8d44\u8baf"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/","url":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/","name":"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7 - \u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8","isPartOf":{"@id":"https:\/\/www.farm-master.com\/#website"},"datePublished":"2026-08-03T07:30:42+00:00","dateModified":"2026-08-28T08:05:16+00:00","description":"Farm Master focuses on livestock and poultry farming equipment and manure resource utilization solutions, sharing technical knowledge related to farming environmental protection, fermentation treatment, organic fertilizer production, and smart farming, providing professional references for farming enterprises.","breadcrumb":{"@id":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.farm-master.com\/news\/overseas-manure-fermentation-tank-project-guide\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.farm-master.com\/"},{"@type":"ListItem","position":2,"name":"\u4ece\u4e2d\u56fd\u5de5\u5382\u5230\u6d77\u5916\u519c\u573a\uff1a\u6709\u673a\u80a5\u53d1\u9175\u7f50\u9879\u76ee\u5982\u4f55\u987a\u5229\u6295\u4ea7"}]},{"@type":"WebSite","@id":"https:\/\/www.farm-master.com\/#website","url":"https:\/\/www.farm-master.com\/","name":"Farm-Master Machinery (Shanghai) Co., Ltd.","description":"Technology empowers fermentation, intelligence leads farming, and green practices build circularity.","publisher":{"@id":"https:\/\/www.farm-master.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.farm-master.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.farm-master.com\/#organization","name":"Farm-Master Machinery (Shanghai) Co., Ltd.","url":"https:\/\/www.farm-master.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.farm-master.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.farm-master.com\/wp-content\/uploads\/2026\/07\/farm-master-logo.webp","contentUrl":"https:\/\/www.farm-master.com\/wp-content\/uploads\/2026\/07\/farm-master-logo.webp","width":716,"height":162,"caption":"\u4e54\u7267\u673a\u68b0(\u4e0a\u6d77)\u6709\u9650\u516c\u53f8"},"image":{"@id":"https:\/\/www.farm-master.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/FarmMasterEquip","https:\/\/wa.me\/8615021175063"]},{"@type":"Person","@id":"https:\/\/www.farm-master.com\/#\/schema\/person\/ac27421b0f0b43606b9c6ce47db3add3","name":"Farm-Master","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/929ee657cc35fc4cede7d7f2a0f3d1300718939f6623ddeb6f2db4a5153f9bb5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/929ee657cc35fc4cede7d7f2a0f3d1300718939f6623ddeb6f2db4a5153f9bb5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/929ee657cc35fc4cede7d7f2a0f3d1300718939f6623ddeb6f2db4a5153f9bb5?s=96&d=mm&r=g","caption":"Farm-Master"},"sameAs":["https:\/\/www.farm-master.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/posts\/3463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/comments?post=3463"}],"version-history":[{"count":3,"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/posts\/3463\/revisions"}],"predecessor-version":[{"id":3472,"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/posts\/3463\/revisions\/3472"}],"wp:attachment":[{"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/media?parent=3463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/categories?post=3463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.farm-master.com\/en\/wp-json\/wp\/v2\/tags?post=3463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}